Building: Generally consists of a concrete framed structure with masonry walls, external finishes, MEP and ID works with BUA of 470m2.
Site Area : 6165 m2 Development Area : 3300 m2
The works include but are not limited to the below-:
Excavation
Back fill
Structural Concrete
Hollow Core Slab
Blockwork / Plaster
Waterproofing
Aluminium works
Aluminium Cladding
Stone Cladding
MEP
ID fit out works
Car Park Shades
Car Park of 1700 m2