![](https://www.nasscontracting.com/wp-content/uploads/2018/11/Durrat-Al-Bahrain-Package-2041-Infrastructure-Phase.jpg)
clientDurrat Khaleej Al Bahrain
consultantKMC-BLL Joint Venture
locationDurrat Al Bahrain
Development of Durrat Al-Bahrain residential and tourist resort, covering an area of 20 sq. km. Over (13) manmade islands, including carrying out infrastructure works such as roads , substations, water supply system, telecommunications and sewerage networks.
All Infrastructure to Atolls 1-4, Petals 1-3 and Mainland “A” as well primary services to Petals 4 & 5
Infrastructure included utilities, roads, footpaths, plazas, substations, pumping stations and irrigations lake.
Soft landscaping to Mainland “A”
Pray park equipment and public landscape furniture