Before start of work ‐ Sheds, Buildings, Existing perimeter fence, High Mast Light Poles and pavement required to be demolished .
Work Comprises in Two parts:
1. P‐925 : Waterfront Development Phase‐I which includes site utility and Communication infrastructure, Consolidated Utility Building (1499 m2), Perimeter Security, Electronic Security System Small Arm range (1476 m2), Port operation and Harbor patrol Building ( 2542 Sqm) . Other improvements like Water Tower Pump building (30 Sqm), Guard Posts (12.70 m2), Roads, Sidewalks, parking etc.
2. P‐926 : Naval Special Warfare Unit Waterfront special operations Facility Portion which includes ( 9320 m2 ) Construction of Multistory Building with pile foundation, Steel Frame, Concrete masonry, concrete roof with insulation, associated utilities, fire protection, LAN, intrusion detection system, ESS and heating venlation, Air conditioning system and Vehicle Storage Facility ( 505 m2).